Advance Infra
Structural steel frame of the Capreol prefabricated building with Georgian Bay beyond

Built right.Built in-house.

Foundations, structural steel and ground-up builds across Ontario, delivered by our own crews and our own engineers.

$0M+
Projects completed
0
Skilled Members
0
Third-party subcontractors
0+
Years of construction experience

We pour the foundation, raise the steel and finish the building with our own people, so quality and schedule never leave our hands.

Advance Infra was founded in 2025 by Sukhwinder Singh Bhogal, who brings more than 20 years of construction experience across two countries.

Completed steel frame of the 20,000 sq. ft. addition in autumn

Everything a build needs, under one roof

Custom Homes

New builds and large additions, engineered and finished to a high standard.

Details
Crane-assisted wood framing of a custom home

Commercial Construction

Ground-up commercial buildings, plazas and multi-use developments.

Details
Steel columns and beams going up on the new slab with the Toronto skyline behind

Prefabricated Steel Buildings

Full structural steel erection for warehouses, plazas and large-span buildings.

Details
Full steel skeleton of the Capreol building before cladding

Foundations and Concrete

Footings, foundations and slab-on-grade built to hold up under any load.

Details
Foundation pour with the pump truck on site

Structural Steel Erection

Precision steel frame erection, backed by in-house structural (civil) engineers.

Details
Capreol building frame rising from the foundation slab

Additions and Retrofits

Building additions, showroom renovations and commercial retrofits.

Details
Completed steel frame of the 20,000 sq. ft. addition in autumn

A different way to build

Structural steel frame of the Capreol prefabricated building with Georgian Bay beyond

Everything in-house

We do not subcontract the work. Our own crews and equipment handle every stage, so quality and schedule stay in our control.

Engineering on staff

In-house structural (civil) engineers are on every project, from design through erection.

Owner on site

The owner is directly involved from foundation to final steel and finish, not managing from a distance.

Built across two countries

At the height of its operations in India, the family company owned a Schwing Stetter concrete batching plant and pump, four concrete trucks and 100,000 sq. ft. of forming equipment, supported by more than 100 skilled workers and labourers.

Interior of Guru Nanak Darbar with the domed ceiling and carved woodwork
Founder-led interior woodwork, Guru Nanak Darbar, Gravesend, UK
  1. 1997

    Joins the family business

    Starts on small residential projects at the construction company founded by his grandfather and later run by his father.

  2. 2006

    Major commercial work

    Takes on large commercial and residential projects through 2019, including a 200,000 sq. ft. hospital and a 20-storey, 400,042 sq. ft. apartment building.

  3. 2019

    Moves to Canada

    Relocates to Ontario and registers Crystal Concrete Company, drawing on two decades of hands-on experience.

  4. 2021

    Foundation subcontractor

    Builds foundations for a Rogers-affiliated contractor through 2023, before the partnership becomes a shared stake in the company.

  5. 2025

    Advance Infra is founded

    Launches in July as sole owner and director. About $2 million in completed work follows in the first five months.

Clad Capreol building under a clear blue sky

Ready to build with confidence?

Tell us about your project and we will come back with a straightforward quote.